Case Study · Florida · Express Car Wash · SBA 7(a)
Car Wash Feasibility Study Case: A New US 41 Express Tunnel in Port Charlotte, Florida, on an SBA 7(a) Loan
Representative worked example. The site, sponsor and project are hypothetical. The market evidence comes from the public sources listed below, with their dates. This page shows how the market analysis is built and how it sets the loan. It is not a client engagement.
Charlotte County grew 16.3% between April 2020 and July 2025 [1], yet at least five express tunnels already sell unlimited plans in Port Charlotte and another is announced for US 41 [12][13][14][17][18]. At the sponsor's 10.0% equity the 7(a) request runs over the program limit and covers Year 2 debt service only 0.77x. The corridor carries $3,510,956 of debt on a $5,746,246 tunnel, so the model reaches the coverage floor only at 38.9% equity.
A new express tunnel on US 41, tested against the SBA 7(a) rules.
Feasibility Study Company prepares studies like this one for owners, developers and their lenders: a dated market read, a competitor census, a priced build and a coverage test that says how much debt a car wash can carry. This page runs that work for one hypothetical project, a new express tunnel in Port Charlotte, Florida, financed with an SBA 7(a) loan. Ask us to run the same work on your site.
The subject is generic: a single tunnel with free vacuums and unlimited plans on about 1.5 acres of commercial frontage along US 41, the Tamiami Trail. Every market figure is public and dated. Every model figure below is computed by the case engine from the inputs listed near the end, each of which carries either a source or the word assumption. The study belongs to our express car wash practice, the town sits in Florida, and the program rules are set out on our SBA 7(a) and 504 page.
| Item | Finding |
|---|---|
| Town, county and corridor | Port Charlotte, Charlotte County, Florida, on the US 41 (Tamiami Trail) commercial corridor |
| Subject (hypothetical) | New express tunnel car wash with unlimited plans and free vacuums on about 1.5 acres of commercial frontage on US 41; parcel, zoning, flood zone, utilities and traffic count to be confirmed |
| Program | SBA 7(a) for a start-up; the page tests the SOP's equity floor, the 7(a) size limit and the coverage floor |
| Total project cost | $5,746,246 as restructured ($5,794,165 under the request) |
| Loan structure | One 7(a) term loan over 25 years at Prime plus the maximum spread for its size, 10.00%; annual debt service $382,849 |
| Equity | Requested 10.0% ($579,416); the coverage test needs 38.9% ($2,235,290) |
| DSCR in the test year (Year 2) | 0.77x on the request; 1.15x on the smaller loan; floor 1.15x |
| Break-even | Year 3 debt service is met at 1,832 average members, 67.9% of the underwritten count |
| Market conclusion | Growing county, crowded corridor: at least five operator-confirmed membership washes and one announced, so a new entrant underwrites a modest member base [1][12][13][16][18] |
| Determination | As proposed (10.0% equity): a $5,214,748 loan over the $5,000,000 7(a) limit, covering Year 2 debt service 0.77x against 1.15x. As restructured: the modeled income carries $3,510,956 of 7(a) debt, which needs 38.9% equity on a $5,746,246 project; no lender approval is implied |
A growing county, a corridor already sold on memberships.
Port Charlotte has the households a tunnel wash needs and already has the tunnels to serve them. That is the finding in one sentence, and it is why this study sizes the loan to a modest member base rather than to the county's growth curve. Charlotte County reached 217,212 residents on July 1, 2025, up 16.3% from 186,823 at the April 2020 census base [1]. The county's own growth consultant ran ahead of the Census Bureau, counting 224,147 residents in February 2025, 5.5% more than ten months earlier, and projecting 256,891 within five years [4].
Supply has kept up. Tommy's Express built a tunnel on Murdock Circle in 2022 [11]. ModWash runs one site on Veterans Boulevard and opened a second on Beatrix Boulevard, which the trade press called the brand's newest location in the market [13][14][15]. Coastal Express lists two Port Charlotte sites on its own website, one of them at Charlotte Square [17]. Bubble Down already posts a price menu for a site on US 41 that its page now marks as coming in 2027, although the page title still says 2026 [18]. A new tunnel on the same road would be the sixth or seventh membership wash a Port Charlotte driver can choose from.
So the question a lender should ask is not whether people will buy unlimited plans here. They already do, from at least three brands that post their menus. The question is how many members a late entrant can win from that menu, and how much debt that member base will carry. This study answers it with a ramp that stabilizes at 2,700 average active members by Year 3, a blended plan price of $30 a month, and single washes at $16. On those inputs the tunnel earns $1,388,000 of revenue and $529,698 of net operating income in its third year.
That income does not support the sponsor's request. At 10.0% equity on a $5,794,165 project, the 7(a) loan would be $5,214,748, more than the program allows for one borrower, and Year 2 income would cover its payments 0.77x. The request as proposed fails. The structure that clears the coverage standard in the model carries $3,510,956 of debt and asks the sponsor for 38.9% of cost. That is a finding about this corridor, not about the format: on a less crowded road the same tunnel would carry more debt.
Four gaps follow the finding into the lender conditions: no state traffic count for the stretch of US 41 in question, no confirmation that the commercial general district allows a car wash by right, no flood zone for the pad, and no published prices from ModWash, whose two sites are the newest competition.
Retirees, new rooftops and a county that keeps adding them.
Port Charlotte is a census-designated place, not a city, so its numbers come from the Census Bureau's place tables and the county's. The 2020 census counted 60,625 residents in the place, which the Bureau does not estimate between censuses [2]. The American Community Survey for 2020 to 2024 puts it at 27,888 households with a median household income of $63,844 in 2024 dollars [2]. The county's 90,542 households earn a median of $69,952 [1]. Both incomes sit below the national median of $80,734 [3].
An older population is a mixed signal for a membership wash. Retired households drive less in the commute peak, and fixed incomes are sensitive to a monthly charge. They also wash when it suits them, on weekdays, which spreads tunnel use across the day rather than stacking it into weekend afternoons. The register table below counts the county's residents aged 65 and over, which shows the scale of that group. No source measured wash frequency by age in this market, so the model draws no benefit from the age profile and treats it as neutral.
Growth is the stronger demand signal, and the county documents where it is landing. Its April 2025 report put the population at 224,147 in February 2025, up 5.5% from 212,424 in April 2024 and 11% higher than in June 2023 [4]. The same report found that the West Port area and Babcock Ranch accounted for 82% of all residential construction since 2024, and expected Mid-County to add 4,400 units [4]. The county budgeted $21,003,317 for its Murdock Village redevelopment fund in FY2025-26, against $6,043,327 for Charlotte Harbor and $2,181,274 for Parkside [6]. New homes on the west side of Port Charlotte put new cars on US 41.
The Census Bureau's housing counts agree on direction. The county issued 3,015 building permits in 2025 and held 131,960 housing units on July 1, 2025 [1]. Employment is smaller than the population would suggest, because so many residents are retired: County Business Patterns counted 44,163 employees at 4,601 employer establishments in 2023 [1]. Major employers and truck volumes were not found, so the study does not lean on a commuter or fleet market.
Visitors add a seasonal layer. Spring-training venues in Port Charlotte, North Port and Sarasota drew crowds in February and March of the 2026 season [5], though the source gives no wash-relevant measure of them. The county budgeted $12,495,000 for its Tourist Development Trust Fund in FY2025-26 and $11,135,000 for its fourth and fifth cent tourist tax [6]. Winter residents and visitors likely lift single-wash sales in the first months of the year, but monthly wash volume was not found, so the model holds volume level across the year.
| Indicator | Figure | Period | Source |
|---|---|---|---|
| Charlotte County population; change since April 2020 | 217,212; +16.3% (base 186,823) | July 1, 2025 | [1] |
| County consultant estimate; April 2024 base | 224,147; 212,424 (+5.5%) | February 2025 | [4] |
| County population forecast | 256,891 within five years | Forecast made 2025 | [4] |
| Share of residential construction in West Port and Babcock Ranch | 82% | Since 2024 | [4] |
| County households; median household income | 90,542; $69,952 | ACS 2020 to 2024 | [1] |
| Port Charlotte population | 60,625 | 2020 Census | [2] |
| Port Charlotte households; median household income | 27,888; $63,844 | ACS 2020 to 2024 | [2] |
| County employees; employer establishments | 44,163; 4,601 | 2023 | [1] |
| Building permits; housing units | 3,015; 131,960 | 2025; July 1, 2025 | [1] |
| Register measure, Charlotte County | Figure | Period and source |
|---|---|---|
| Car wash establishments (NAICS 811192; the express tunnel format cannot be separated) | 11 | Establishments, County Business Patterns 2023. U.S. Census Bureau, County Business Patterns, 2023 County Business Patterns, all industries (Census Data API cbp, NAICS2017=*). https://api.census.gov/data/2023/cbp |
| Car wash paid employees | 56 | Paid employees, pay period including March 12, County Business Patterns 2023 (noise-infused; EMP_N per code in the raw files). U.S. Census Bureau, County Business Patterns, 2023 County Business Patterns, all industries (Census Data API cbp, NAICS2017=*). https://api.census.gov/data/2023/cbp |
| Median value of owner-occupied homes | $328,900 | Median value, owner-occupied units, dollars (B25077), 2020-2024 (ACS 5-year). U.S. Census Bureau, American Community Survey, American Community Survey 5-Year Estimates, Detailed Tables, 2020-2024 (Census Data API acs/acs5). https://api.census.gov/data/2024/acs/acs5 |
| Median gross rent per month | $1,464 | Median gross rent, dollars (B25064), 2020-2024 (ACS 5-year). U.S. Census Bureau, American Community Survey, American Community Survey 5-Year Estimates, Detailed Tables, 2020-2024 (Census Data API acs/acs5). https://api.census.gov/data/2024/acs/acs5 |
| Unemployment rate | 5.4% | Unemployment rate: unemployed over civilian labor force (B23025), 2020-2024 (ACS 5-year). U.S. Census Bureau, American Community Survey, American Community Survey 5-Year Estimates, Detailed Tables, 2020-2024 (Census Data API acs/acs5). https://api.census.gov/data/2024/acs/acs5 |
| Per capita income | $42,592 | Per capita income, inflation-adjusted dollars (B19301; for a set of areas, B19313 aggregate income over B01003 population), 2020-2024 (ACS 5-year). U.S. Census Bureau, American Community Survey, American Community Survey 5-Year Estimates, Detailed Tables, 2020-2024 (Census Data API acs/acs5). https://api.census.gov/data/2024/acs/acs5 |
| Residents 65 and over | 81,528 | Population 65 and over (B01001, twelve age cells summed), 2020-2024 (ACS 5-year). U.S. Census Bureau, American Community Survey, American Community Survey 5-Year Estimates, Detailed Tables, 2020-2024 (Census Data API acs/acs5). https://api.census.gov/data/2024/acs/acs5 |
| Per capita personal income | $59,995 | Per capita personal income, 2024 (CAINC1 line 3 for a single area; for a set of areas, summed line 1 over summed line 2). U.S. Bureau of Economic Analysis, Regional dataset, table CAINC1, line codes 1 to 3 (BEA API GetData). https://www.bea.gov/data/income-saving/personal-income-by-county |
Five operator-confirmed washes, one more announced.
Every row below links the operator's own website, and one competitor's lot is also confirmed in the county appraiser's record. Review counts and directory listings were left out: they measure online attention, not cars washed, and several directory pages disagree with the operators about who runs which site. Dollar prices on operator pages are described, not printed, because the research ties none of them to a publication date; a fresh pull of every menu is a lender condition. Distances from the subject are not given, because the subject is a hypothetical pad on US 41 rather than a fixed address.
| Competitor | Location | Format and facts | Posted prices | Confirming page | Source |
|---|---|---|---|---|---|
| Tommy's Express | 19010 Murdock Cir, at the Murdock Circle retail node | Express tunnel built in 2022 on CG-zoned land; 6,417 sq ft building; app lane for members; open daily | Single washes and tiered unlimited plans posted, dollar amounts on the operator page | tommys-express.com | [11][12] |
| ModWash, Veterans | 19250 Veterans Blvd | Express wash; open daily; plan tiers named | No dollar amounts on the location page | modwash.com | [13] |
| ModWash, Beatrix | 24080 Beatrix Blvd | Express wash; grand opening on a Friday in July (the article gives no year); open daily | No dollar amounts on the location page; opened with a discounted first month for its first members and a locked monthly rate afterwards | modwash.com | [14][15] |
| Coastal Express, Tamiami | 3291 Tamiami Trail | Express wash, listed on the operator's locations page | Single washes and monthly tiers posted; the operator's packages page carries a last-modified stamp from 2025 | coastalexpresscarwash.com | [16][17] |
| Coastal Express, Charlotte Square | 2105 S Tamiami Trl | Listed by the operator as a second Port Charlotte site; format not described | Not posted separately | coastalexpresscarwash.com | [17] |
| Bubble Down (announced) | 4618 Tamiami Trail | Express tunnel; page body says coming 2027, page title still says 2026 | Single washes and monthly tiers posted, plus tax | bubbledown.com | [18] |
| Circle K | 20570 Veterans Blvd | Fuel station with a car wash; not a tunnel competitor for members | Not reviewed | circlek.com | [19] |
The menus define a narrow band. The three operators that post dollar amounts each run a tiered unlimited ladder, and the newest entrant, Bubble Down, posts a menu that lands inside the band the other two set [12][16][18]. That suggests it expects to compete on site and service rather than price. ModWash is the gap. It is the only brand with two sites in the market and it posts no dollar amounts on either location page; the one price signal in the record is the discounted first month and locked monthly rate it offered its first Beatrix members [15]. Its full menu is the first competitor fact a lender should pull.
The appraiser's record for the Tommy's lot is the best cost and value evidence in the market. The parcel is zoned CG, the building was completed in 2022, and the 2026 roll carries a just value of $2,509,667, a county taxable value of $2,323,668 and land at $1,400,880 [11]. The land itself sold for $1,800,000 on February 7, 2020, before construction [11]. A rival paid that for the land at the Murdock Circle retail node before its 2022 build, which tells a lender that a well-placed pad is not cheap even when an appraiser later values the finished tunnel modestly.
Two more washes sit at the edges of the census. A Mister Car Wash on McCall Road in the Gulf Cove area, an outer-ring site opened in 2022 on a 1.47-acre parcel, was reported sold for $6 million to out-of-state investors in October 2026 [20]. Mister's own website refused automated access, so the site stays out of the table, but the sale price is the clearest local evidence of what a finished, leased tunnel is worth. A long-running tunnel on El Jobean Road appears in directories, but its operator's domain has lapsed and no assessor record was pulled; it is unconfirmed and carries no weight here. Bubble Down also marks a Punta Gorda site on Tamiami Trail as coming in 2027 [18], outside the Port Charlotte trade area but on the same highway.
Charlotte Square needs a note. The operator lists it on South Tamiami Trail [17], while some directories show other wash names at that address and a listing service shows a car wash there for sale. The operator's page is treated as governing, no figure from the sale listing is used, and the lender should confirm the site's status and format.
No Charlotte County permits or planning agendas for new car washes were found. Bubble Down's slipped date shows the pipeline is real but uncertain [18]. A lender should read the county's commercial permits for car wash projects on US 41, Veterans Boulevard and El Jobean Road before it accepts the member ramp.
A hypothetical US 41 pad with flood, zoning and traffic open.
The subject is a hypothetical pad of about 1.5 acres with frontage on US 41, the Tamiami Trail, in unincorporated Port Charlotte. Land is carried at $1,100,000, a round assumption, not the price of any parcel: the reasoning in the inputs table starts from the appraiser's land value on the Tommy's lot and discounts it for a pad away from the Murdock Circle node. An appraisal and an executed contract set the value, and both are conditions.
Zoning is the first open item. The Tommy's lot is zoned CG, commercial general, and a tunnel was built on it in 2022 [11], which shows a car wash can be approved in that district. It does not show whether the use is permitted by right or needs a conditional approval, and the use table was not read for this study. Neither the approval path nor a typical timeline was found, so a written zoning verification for the actual pad is a condition.
Flood is the second. The Tommy's lot is split between Zone AE and Zone X on a FEMA panel effective December 15, 2022 [11]. A lot that straddles a special flood hazard area needs the tunnel pit, equipment room and pay stations set above base flood elevation or floodproofed, and the lender needs flood insurance on any building in Zone AE. The county's FY25 budget workshop still carried a Hurricane Ian return-to-roll item [10], a reminder that storm losses here are recent. Until the pad's zone is known, the soft-cost contingency and the insurance line are placeholders.
Traffic is the third. No Florida Department of Transportation station or annual average daily traffic count for the stretch of US 41 in question was found in the research. The only counts available came from a seller's marketing material for a listed property, which this study does not use. Traffic is therefore a lender condition: the state count, its station and year for the pad's frontage, and a check of turning access for cars entering the stacking lane from the highway.
Utilities are the fourth. The provider, capacity and connection charge for the pad were not confirmed, and the electric and gas providers were not identified. A tunnel discharges wash water, so sewer capacity and any pretreatment or reclaim requirement matter more than they would for a store.
| Item | Finding | Period | Source |
|---|---|---|---|
| Countywide operating millage; rollback rate; excess over rollback | 6.0394 mills; 5.8133 mills; 3.89% | FY2025-26, adopted September 23, 2025 | [6] |
| General fund split | Board of County Commissioners 2.2142 mills; Sheriff 2.5723 mills | FY2025-26, tentative September 4, 2025 | [7] |
| Law Enforcement MSTU (unincorporated); street lighting district | 2.1449 mills; 0.1907 mills | FY2025-26 | [6] |
| County "total millage" series, latest | 11.6998 mills (scope not stated; appears county-levied only) | Series through September 2025, presented January 20, 2026 | [8] |
| School, water management and inlet district millage | Not found | n/a | n/a |
| Impact fee, retail and commercial, updated maximum; transportation part; transportation fee then in force | $11,727; $7,848; $9,484, each per 1,000 sq ft | August 2020 study | [9] |
| Flood zone at the Tommy's lot; FIRM panel | Zone AE and Zone X; panel effective December 15, 2022 | Appraiser record, 2026 roll | [11] |
Florida taxes real property on the appraiser's value, so the model does not apply the rate to cost. It applies an assumed combined rate of 1.70% to an assumed taxable value of $3,000,000. The county-levied rates above are sourced; the school and district rates are not, and the gap is covered by an allowance explained in the inputs table. The 2020 impact fee study is six years old, so the current adopted fee, and whether the county charges a car wash at the retail rate, are conditions [9].
Members carry the loan; single washes fill the gaps.
| Line | Basis | Year 1 | Year 3 | Year 5 |
|---|---|---|---|---|
| Unlimited plan revenue | members x monthly price x 12 | $468,000 | $972,000 | $1,062,000 |
| Single wash revenue | washes x average ticket | $384,000 | $416,000 | $432,000 |
| Total revenue | $852,000 | $1,388,000 | $1,494,000 |
Revenue has two lines. Plan revenue is average active members times the blended monthly price times twelve, and single-wash revenue is wash count times average ticket. Prices stay flat for five years; any price rise is upside the lender does not need.
How many members. The model reaches 2,700 average active members in Year 3 after lower counts in Years 1 and 2. No operator in Port Charlotte discloses its member count, so the ramp leans on national evidence, set out in the inputs table, and is held down for this market. At least five tunnels already sell plans to the same drivers, and two of them are recent or still to come: ModWash on Beatrix Boulevard, which the trade press calls the brand's newest location in the market, and Bubble Down, which is not yet open [15][18]. A member who joined Tommy's in 2022 has little reason to switch to a new tunnel nearby unless the new site is easier to reach on the way home.
What members pay. $30 a month is a blend across plans, not a posted price. It sits in the lower half of the ladders the three pricing operators post [12][16][18], and the model does not assume the subject can charge a premium. A sponsor who wants to price above the band needs a reason the corridor does not yet show, such as a longer tunnel or a better position on the evening drive home.
Single washes. The ticket of $16 falls between the entry and second tiers of the posted single-wash menus and well under their top tiers [12][16][18]. Single volume grows slowly while plan revenue builds. Winter residents and spring-training visitors probably buy more single washes early in the year [5], but seasonality was not measured, so the model does not count it.
What it adds up to. Revenue is $852,000 in Year 1, $1,192,000 in Year 2 and $1,388,000 in Year 3. The inputs table compares those figures with franchise cohort averages; the subject sits below them on purpose, because a tunnel arriving after five others should not be underwritten like an average site.
Ratios for the wash, fixed lines for wind and tax.
| Line | Basis | Year 1 | Year 3 | Year 5 |
|---|---|---|---|---|
| Labor and chemicals | share of revenue | $247,080 | $402,520 | $433,260 |
| Utilities, repairs, card fees, software, marketing | share of revenue | $161,880 | $263,720 | $283,860 |
| Management and brand allowance | share of revenue | $42,600 | $69,400 | $74,700 |
| Insurance, including wind and flood | assumption, grows yearly | $65,000 | $71,662 | $79,008 |
| Property tax | taxable value x rate [6][8][11] | $51,000 | $51,000 | $51,000 |
| Total operating expenses | $567,560 | $858,302 | $921,828 | |
| Net operating income | $284,440 | $529,698 | $572,172 |
Three cost lines move with revenue and two do not. Labor and chemicals run at 29.0% of revenue, and utilities, repairs, card processing, software and marketing at 19.0%. The labor and chemicals ratio rests on the only audited multi-site profit and loss statement in the industry; the other-costs ratio is a judgement for a single owned site, explained in the inputs table. A 5.0% allowance for management stands in for the owner's time or a franchise fee.
Insurance is where Port Charlotte differs from an inland town. The model starts at $65,000 for property, wind, flood and liability cover and raises it 5.0% a year. That is a placeholder, not a quote. The nearest tunnel's lot is partly in Zone AE [11], and a wash building full of electrical equipment on a coastal corridor will be priced by wind and flood carriers, not by a general rate card. The bound quote is a condition, and a large miss on this line moves coverage more than a small miss on any ratio.
Property tax is set at $3,000,000 of taxable value times 1.70%. The sourced part of the rate is the county's: 6.0394 mills of countywide operating millage, adopted 3.89% above the rollback rate [6], within a county-levied series that ended at 11.6998 mills [8]. The school and district levies were not found, and they are not small, so the model carries an allowance for them. The Tommy's lot shows how Florida's assessment works on a newer tunnel: a 2026 county taxable value below its just value [11].
The result is a net operating income margin of 38.2% in Year 3. That is lower than a large chain earns before rent, which is deliberate. A single tunnel has no purchasing scale, and a crowded corridor tends to push spending into marketing and app promotions to hold members.
A cost near what finished tunnels sell for here.
| Use of funds | Basis | Amount | Share |
|---|---|---|---|
| Land, about 1.5 acres on US 41 | assumption, see inputs | $1,100,000 | 19.1% |
| Tunnel building, canopies and site work | assumption, see inputs | $2,450,000 | 42.6% |
| Design, permits, impact fees and contingency | assumption [9] | $400,000 | 7.0% |
| Tunnel equipment, pay stations and vacuums | assumption, see inputs | $1,550,000 | 27.0% |
| Pre-opening costs and working capital | assumption, see inputs | $150,000 | 2.6% |
| SBA upfront guaranty fee (added to project cost) | [32] | $96,246 | 1.7% |
| Total project cost | $5,746,246 | 100.0% |
| Source of funds | As proposed | Share | As restructured | Share |
|---|---|---|---|---|
| SBA 7(a) loan, whole loan | $5,214,748 | 90.0% | $3,510,956 | 61.1% |
| Sponsor equity | $579,416 | 10.0% | $2,235,290 | 38.9% |
| Total sources | $5,794,165 | 100.0% | $5,746,246 | 100.0% |
Total project cost is $5,746,246 after the restructure, including the SBA guaranty fee the model adds to cost. Each line is an assumption explained in the inputs table: land at $1,100,000, the building and site at $2,450,000, equipment at $1,550,000, design, permits, impact fees and contingency at $400,000, and pre-opening costs and working capital at $150,000.
Two local transactions frame that total. Tommy's paid $1,800,000 for its Murdock Circle land in February 2020 [11], a land price above the subject's assumption because of the location. And investors paid a reported $6 million for the leased Mister site on McCall Road in October 2026 [20], which is the market's own price for a finished tunnel with an operator in place. The subject's cost sits just under that price. A lender should not expect the appraisal of a new, unproven tunnel to reach the price an investor paid for a seasoned, leased one, so the business itself, not the real estate, has to carry part of the value.
B+E's August 2025 net-lease report put the average asking cap rate on Florida car wash listings at 6.43% [29], a state-level read on how the market values a leased wash with an operator behind it. It is an asking rate, not a closed trade, and it applies to finished, tenanted sites rather than to a start-up that has yet to wash a car.
The pre-opening line deserves attention. ModWash opened Beatrix Boulevard with a discounted first month for its first members [15]. A new tunnel in this market will have to match an offer like that, which means months of discounted revenue before the ramp starts to show in the pro forma. The working capital line is meant to absorb that, but it is thin if the opening offer runs long.
One 7(a) term loan, sized to the corridor.
| Tranche | Lender | Amount | Rate | Amortization | Annual debt service |
|---|---|---|---|---|---|
| SBA 7(a) loan, whole loan | Bank (SBA 7(a), 75% guaranteed) | $3,510,956 | 10.00% | 25 years | $382,849 |
| Total debt | $3,510,956 | $382,849 |
Rate: Prime of 7.00% [33] plus the maximum variable-rate spread SBA allows for this loan size [31], held for the full term; a fixed-rate loan has its own, separate maximum, and a lender may price lower. Guaranty: 75% of the loan, Source [30].
The rules are those of SOP 50 10 8.1 with Technical Policy Updates, effective [31]. A start-up borrower injects at least 10%, and its projections have two years to reach 1.15x coverage, so the test falls on Year 2. Land, building and site work are more than half of the uses, so the loan runs 25 years. The rate is Prime, 7.00% on October 9, 2026 [33], plus the largest variable spread SBA allows for a loan of this size, 10.00% in all; a lender may price lower, and the rate is set at closing. SBA guarantees 75.0% of a loan this size [30].
The request fails before coverage is even tested. At 10.0% equity the loan would be $5,214,748, above the $5 million 7(a) maximum. A sponsor in that position usually looks to pair 7(a) with a 504 loan or a conventional piece, but no structure helps if the tunnel's income cannot cover the payments, and here it cannot: Year 2 coverage on the full request is 0.77x. The restructured loan of $3,510,956 is well inside the limit.
The guaranty fee for fiscal 2027 is charged on the guaranteed portion and added to project cost [32]. The fee waiver for rural borrowers stops at $700,000, so it cannot apply to a loan of this size whatever the county's rural status, which was not checked. SBA's list of special purpose properties names car wash businesses, and defines the class as a limited-market property with a unique physical design, special construction materials, or a layout that restricts its utility to the use for which it was built [31]. That shapes the appraisal: the lender will want an appraiser who has valued tunnels before. Owner eligibility is tested at the lender's eligibility review under the SOP in force at approval, and the program's citizenship and residency requirements were rewritten by a notice effective March 1, 2026 [35].
The study is the lender's tool here, not a program checkpoint: 13 CFR 120.160(b): SBA may require professional appraisals, a survey, or a feasibility study [34]. For a start-up wash in a corridor with five rivals, the study's job is to say how much debt the member base supports before the lender has to find out from the payment history.
Income climbs with members; Year 1 runs short.
| Line | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|---|---|---|---|---|
| Unlimited plan revenue | $468,000 | $792,000 | $972,000 | $1,026,000 | $1,062,000 |
| Single wash revenue | $384,000 | $400,000 | $416,000 | $424,000 | $432,000 |
| Total revenue | $852,000 | $1,192,000 | $1,388,000 | $1,450,000 | $1,494,000 |
| Labor and chemicals | ($247,080) | ($345,680) | ($402,520) | ($420,500) | ($433,260) |
| Utilities, repairs, card fees, software, marketing | ($161,880) | ($226,480) | ($263,720) | ($275,500) | ($283,860) |
| Management and brand allowance | ($42,600) | ($59,600) | ($69,400) | ($72,500) | ($74,700) |
| Insurance, including wind and flood | ($65,000) | ($68,250) | ($71,662) | ($75,246) | ($79,008) |
| Property tax | ($51,000) | ($51,000) | ($51,000) | ($51,000) | ($51,000) |
| Net operating income | $284,440 | $440,990 | $529,698 | $555,254 | $572,172 |
| Debt service (as restructured) | ($382,849) | ($382,849) | ($382,849) | ($382,849) | ($382,849) |
| Cash flow after debt service | ($98,409) | $58,141 | $146,848 | $172,405 | $189,323 |
| DSCR | 0.74x | 1.15x | 1.38x | 1.45x | 1.49x |
The pro forma runs on the restructured loan. Revenue rises from $852,000 to $1,494,000 as members accumulate, and net operating income from $284,440 in Year 1 to $529,698 in Year 3 and $572,172 in Year 5. Ratio costs move with revenue; insurance climbs every year and property tax stays fixed. Year 1 coverage is 0.74x, so the first year's shortfall has to come from the sponsor's cash or an interest reserve, not from operations.
The determination: the request fails, the corridor sets the loan.
| Year | NOI | Debt service, proposed | DSCR, proposed | Debt service, restructured | DSCR, restructured | Floor |
|---|---|---|---|---|---|---|
| Year 1 | $284,440 | $568,637 | 0.50x | $382,849 | 0.74x | 1.15x |
| Year 2 (test year) | $440,990 | $568,637 | 0.77x | $382,849 | 1.15x | 1.15x |
| Year 3 | $529,698 | $568,637 | 0.93x | $382,849 | 1.38x | 1.15x |
| Year 4 | $555,254 | $568,637 | 0.97x | $382,849 | 1.45x | 1.15x |
| Year 5 | $572,172 | $568,637 | 1.00x | $382,849 | 1.49x | 1.15x |
| Test | Rule | As proposed | As restructured |
|---|---|---|---|
| Equity injection | SOP 50 10 8.1: 10% [31] | 10.0% (meets) | 38.9% (meets) |
| Program size limit | SOP 50 10 8.1: $5 million [31] | $5,214,748 (over the limit) | $3,510,956 (meets) |
| Debt service coverage | SOP 50 10 8.1: 1.15x [31] Basis: historical and/or projected, with 1:1 global coverage; start-ups reach 1.15x within two years. | 0.77x on Year 2 (fails) | 1.15x on Year 2 (meets) |
As proposed: the sponsor requests the 7(a) start-up minimum, with 10.0% equity ($579,416) and $5,214,748 of debt. The structure does not qualify: the loan exceeds the program size limit; coverage falls below the floor.
As restructured: 38.9% equity ($2,235,290) and $3,510,956 of debt with $382,849 of annual debt service. Every test is met.
A 7(a) start-up is tested on projections against 1.15x, and this study applies the test in Year 2, the last year the projection has to get there.
As proposed, the sponsor puts in $579,416, 10.0% of a $5,794,165 project, and asks for $5,214,748. The request fails twice. The loan is over the 7(a) limit, and annual debt service of $568,637 is covered 0.77x in Year 2 and 0.93x in Year 3. Even in Year 5 the request covers only 1.00x. It meets neither the program limit nor the coverage floor.
As restructured, the engine holds the project and asks how much debt Year 2 income will carry at the floor. The answer is $3,510,956, with debt service of $382,849 a year, which leaves the sponsor to fund 38.9% of cost, $2,235,290. Coverage is then 1.15x in Year 2, 1.38x in Year 3 and 1.49x in Year 5. The program's injection rule is met many times over; it is the corridor's income that sets the equity.
That is a negative answer to the request and a conditional answer to the project. The restructured case is a model result, not a recommendation and not a forecast of any lender's decision: on these inputs, a sponsor with $2,235,290 to commit and the liquidity to carry Year 1 would meet the coverage floor in the test year. A sponsor without it should look for a cheaper pad, a smaller building, or a less crowded road, because a larger loan on this corridor depends on taking members from five established tunnels.
If you are weighing a tunnel on a corridor like this one, ask Feasibility Study Company for a study of your own site. The work is the same as above: the competitor census, the priced build and the coverage test, written so that a lender can read each step.
How many members cover the restructured loan.
| Measure | Value |
|---|---|
| Underwritten average active members, Year 3 | 2,700 |
| Annual debt service (as restructured) | $382,849 |
| Average active members at which NOI equals debt service (1.00x) | 1,832 (67.9% of underwritten) |
| Cushion before cash break-even | 32.1% |
| Average active members at which coverage equals the 1.15x floor | 2,172 (80.4% of underwritten) |
The break-even is solved on average active members in Year 3, with every other input held. Net operating income equals debt service at 1,832 members, 67.9% of the underwritten count, a cushion of 32.1%. Coverage stays at the floor down to 2,172 members.
The cushion looks comfortable because the loan was cut to fit. It shrinks fast if the ramp slips: a tunnel that reaches its Year 3 count a year late spends a second year near the floor. The break-even trap note explains why a lender should test the ramp, not only the stabilized year.
Members and price in the test year.
| Members \ Blended member price | -15% | -8% | 0% | +8% | +15% |
|---|---|---|---|---|---|
| -20% | 0.84x | 0.89x | 0.95x | 1.01x | 1.07x |
| -10% | 0.92x | 0.98x | 1.05x | 1.12x | 1.18x |
| 0% | 1.00x | 1.07x | 1.15x | 1.22x | 1.29x |
| +10% | 1.08x | 1.16x | 1.24x | 1.32x | 1.40x |
| +20% | 1.17x | 1.25x | 1.34x | 1.43x | 1.52x |
DSCR in Year 2 on the restructured loan. Rows change members; columns change blended member price. Green meets the 1.15x floor, amber covers debt service but misses the floor, red does not cover debt service. The outlined cell is the underwritten case.
The matrix moves the two inputs that set plan revenue, members by up to a fifth each way and the blended price by up to about a sixth, and reads coverage in Year 2, the test year. On the restructured loan, coverage ranges from 0.84x to 1.52x. The centre cell sits on the floor by construction, so every cell where both members and price fall below plan fails.
That is the honest shape of a loan sized to the floor in the test year: it has no spare coverage in Year 2, and it relies on Year 3 for its margin. The corner where both inputs fall is the one to fear in Port Charlotte. If ModWash's two sites and Bubble Down's opening push plan prices down toward the entry tier of the posted menus while the subject signs fewer members, Year 2 coverage drops toward 0.84x. A lender who wants a margin in the test year needs more equity than the restructure shows, or an interest reserve that covers the shortfall.
Every input and its basis.
Each input below carries its source number or, where no source gives the figure, the word assumption and its reasoning. Only the SBA guaranty share is sourced directly. Land, cost lines, member and wash volumes, prices, expense ratios, insurance and the property tax base and rate are assumptions; their reasoning cites the local records and the national benchmarks they rest on.
| Input | Value | Basis |
|---|---|---|
| Site area, acres (hypothetical US 41 pad) | 1.5 | Assumption: Round figure set by the operating tunnels around it: the Tommy's Express lot on Murdock Circle measures 58,370 sq ft on the 2026 roll, about 1.3 acres [11], and the Mister Car Wash lot on McCall Road was reported at 1.47 acres [20]. Three listed net-lease Mighty Wash sites averaged 1.54 acres in May 2026 [27]. About 1.5 acres fits one tunnel, a stacking lane for members and a vacuum row. |
| Land, about 1.5 acres of commercial frontage | $1,100,000 | Assumption: A round placeholder, not the price of any parcel. The only appraiser value for car wash land on the corridor is the Tommy's Express lot, where the 2026 roll carries land at $1,400,880 for 58,370 sq ft, about $24 a sq ft, after a $1,800,000 sale in February 2020 [11]. That lot sits at the Murdock Circle retail node; a mid-corridor pad is carried at about $17 a sq ft. An appraisal and an executed contract replace this line. |
| Tunnel building (about 5,000 sq ft), vacuum canopies, paving and drainage | $2,450,000 | Assumption: No Charlotte County construction cost was found. The building size sits between the 4,455 sq ft average of three listed Mighty Wash buildings [27] and the 6,417 sq ft Tommy's building completed in Port Charlotte in 2022 [11]. Finished tunnels listed at an average of $5.11 million including land in April 2026 [26] and Mister sold one site in a sale-leaseback for $5.0 million in the third quarter of 2025 [23]; this line plus land and soft costs stays below those values because equipment is carried separately. Steel mill products rose 23.4% in the year to August 2026 [28], so the line is not set low. |
| Conveyor, wash equipment, pay stations and vacuum system | $1,550,000 | Assumption: No equipment quote and no published equipment share of cost was found. The 2026 Tommy's Express disclosure puts total investment for its tunnel at $3,482,389 to $11,846,697 [25]; the land, building and equipment lines here total in the lower part of that range. Aluminum mill shapes rose 27.3% in the year to August 2026 [28]. A vendor quote is a lender condition. |
| Design, permits, impact fees, survey and contingency | $400,000 | Assumption: Charlotte County's August 2020 impact fee study set an updated maximum of $11,727 per 1,000 sq ft for retail and commercial use [9], about $59,000 for a 5,000 sq ft building if that category applied; the current adopted fee and the car wash category were not found. The rest covers design, survey, stormwater engineering and a contingency for a flood zone that is not yet known. |
| Pre-opening payroll, marketing and working capital | $150,000 | Assumption: Covers hiring, training and opening promotions. ModWash opened its Beatrix Boulevard tunnel with a discounted first month for its first top-plan members [15], so a new entrant should budget for a discounted launch. |
| Average active unlimited members | 1,300 / 2,200 / 2,700 / 2,850 / 2,950 | Assumption: No member count for any Port Charlotte tunnel was found. Mister ended 2025 with about 2.3 million members at 548 locations [21], about 4,200 a site by division; the subject stabilizes well below that because at least five tunnels already sell plans in the market and a sixth is announced on US 41. Year 1 is about half of the stabilized count. As a check on the ramp, Tommy's Express first-year sites averaged $1,093,264 of gross sales in 2024 and its later-year cohorts $1,603,302 to $2,204,358 [24]; the model's Year 1 revenue sits below the first figure and its Year 3 revenue below every later one. |
| Blended member price per month | $30 | Assumption: A round blend, not a posted price. Tommy's Express, Coastal Express and the announced Bubble Down site each post a tiered menu of unlimited plans [12][16][18], and ModWash names its tiers without dollar amounts [13]. Their amounts are not printed here because the pages carry no publication date. The blend is set in the lower half of the posted ladders, on the view that most members of a new tunnel buy a middle plan and some take opening discounts. A fresh pull of every menu is a lender condition. |
| Retail (single) washes | 24,000 / 25,000 / 26,000 / 26,500 / 27,000 | Assumption: No wash counts were found for any local site. Retail volume grows slowly while members grow; at Mister, members produced 76% of 2025 wash sales [21], and the model reaches about 70% by Year 3, lower because a newcomer converts fewer retail customers. |
| Average retail ticket | $16 | Assumption: A round figure between the entry and second single-wash tiers on the menus of the operators that post them [12][16][18]; their dollar amounts are undated and not printed here. A fresh pull of the menus is a lender condition. |
| Labor and chemicals, share of revenue | 29.0% | Assumption: Mister reported labor and chemicals at 28.7% of 2025 revenue [22]. A single tunnel buys chemicals without chain pricing, so the share is rounded up. |
| Utilities, repairs, card fees, software and marketing, share of revenue | 19.0% | Assumption: Mister's other store costs were 41.5% of 2025 revenue [22], a chain-wide ratio that includes about $123 million of rent [23], which an owner-occupied site does not pay. The ratio carried here is lower for that reason and is a judgement, not a figure from any filing: no single-site operating statement was found, and a comparable site's statements are a lender condition. Property tax and insurance are separate lines here. |
| Management and brand allowance, share of revenue | 5.0% | Assumption: Stands in for owner management or a franchise. The market price of brand and support in this format is a 4% royalty and a 1% brand fund in the Tommy's Express disclosure [25]. |
| Property, wind, flood and liability insurance, Year 1 | $65,000 | Assumption: No insurance quote was found. The nearest operating tunnel's lot straddles flood Zone AE and Zone X on the 2022 FEMA panel [11], and the county's FY25 budget workshop still carried a Hurricane Ian return-to-roll line [10], so the placeholder is set well above an inland site. A bound quote is a lender condition. |
| Annual growth in insurance cost | 5.0% | Assumption: No Florida commercial premium series was found. The growth rate is set above general inflation as a cushion for coastal wind and flood cover on a site whose flood zone is not yet known; the bound quote and its renewal terms replace it. |
| Taxable value of land, building and equipment | $3,000,000 | Assumption: Florida taxes at assessed value, not cost. The 2022 Tommy's tunnel carries a 2026 just value of $2,509,667 and a county taxable value of $2,323,668 [11]; a newer building with its equipment on the tangible roll is set somewhat higher. The property appraiser's first assessment replaces this line. |
| Combined property tax rate, as a share of taxable value | 1.70% | Assumption: The county's own series of county-levied millage ends at 11.6998 mills [8], which includes the 6.0394 countywide operating rate [6]. School board, water management district and inlet district levies were not found, and about 5.3 mills is added as an allowance for them. The tax collector's estimate replaces this line. |
| SBA guaranty share | 75.0% | Source [30] |
What could break a sixth tunnel on US 41.
- Member capture. At least five tunnels already sell plans [12][13][14][16][17]. If the subject signs members at the pace of a first-year site in an open market rather than a crowded one, the ramp is too slow and Year 2 coverage misses.
- A price war. ModWash showed that it will open with a discounted first month [15], and Bubble Down is preparing its own opening [18]. Launch discounts from two newcomers could hold the market's blended price down for a year or more.
- Pipeline. Bubble Down has posted prices for a US 41 site whose date has slipped to 2027 [18]. When it opens, it competes for the same corridor drivers, and no county permit record was found to show what else is coming.
- Flood and wind. The nearest tunnel's lot is partly in Zone AE [11]. An adverse zone adds elevation work, mandatory flood cover and a smaller appraisal. Insurance is a placeholder until quoted.
- Tax uncertainty. Countywide operating millage was set above the rollback rate for FY2025-26 [6], and the school and district rates were not found. The tax line could be higher than modelled.
- Appraisal gap. The Tommy's tunnel is carried on the 2026 roll at a just value far below the cost of building a new one [11]. Special purpose collateral narrows the lender's recovery if the business fails.
- Construction costs. A tunnel is steel and aluminum heavy, and those prices rose sharply into 2026 [28]; the figures are in the inputs table. A bid priced late in a rising market can exceed the budget.
- Program change. SBA rewrote its citizenship and residency requirements in a notice effective March 1, 2026 [35], and a new SOP took effect on October 1 [31]. A loan approved later should be rechecked against the rules in force.
The special purpose property note explains why lenders treat car washes as limited-market collateral, and the SOP 50 10 8.1 note covers the October 2026 rule changes.
Eleven items to close before commitment.
Each condition below comes from an item the research could not find or could not confirm. Together they cover every data point the research marked not found, grouped where one action closes several.
- Parcel and price. Identify the pad, its parcel number, title and legal description, and an executed contract price; order an appraisal by an appraiser experienced with car washes. The land line is an assumption, not the price of any parcel.
- Zoning. Obtain written verification of whether a car wash is permitted by right in the pad's CG district or needs a conditional approval, and the expected approval timeline.
- Flood. Pull the FEMA panel and zone for the pad, an elevation certificate where it applies, and confirm the floodplain rules the building must meet.
- Traffic and access. Obtain the state annual average daily traffic count, station and year for the pad's US 41 frontage, the distance to the nearest I-75 interchange, and the turning access to the stacking lane.
- Utilities and fees. Confirm the water and sewer provider, capacity, connection charges and any wash water pretreatment rule; identify the electric and gas providers; confirm the impact fee in force today and the category a car wash falls in, and the current permit fee schedule.
- Competitor prices and records. Pull a fresh, dated copy of every competitor's menu, including ModWash's dollar amounts for both Port Charlotte sites, Mister Car Wash's and the El Jobean Road tunnel's, and the parcel, acreage and 2025 tax bill for each competitor, including the Tommy's tax bill.
- Charlotte Square. Confirm who operates the South Tamiami Trail site the operator lists, its format and whether it is for sale.
- Pipeline. Review county permits and planning agendas for car wash projects, Bubble Down's site size and opening date, and the opening year of ModWash Veterans.
- Trade area data. Order radius or drive-time demographics from a primary source with daytime employment, a Florida comparison, major employers and truck volumes, and monthly wash seasonality.
- Costs, insurance and tax. Obtain a contractor's bid and an equipment vendor quote, a construction cost index for the region, bound property, wind and flood insurance quotes, the school, water management and inlet district millage, the assessment practice for a new tunnel and its equipment, sales tax and surtax treatment of wash sales, and the licenses a car wash needs.
- Program and sponsor. Confirm the eligibility of every direct and indirect owner and guarantor under the SOP in force, sponsor liquidity or an interest reserve for the Year 1 shortfall and a Year 2 cushion, 7(a) lending activity in Charlotte County from SBA's loan data, and USDA rural, HUBZone and Opportunity Zone status where they affect fees or pricing.
What lenders ask about the Port Charlotte tunnel case.
Why does a 7(a) start-up that meets the 10% injection still fail?
Because the injection is a floor and coverage is the test. A start-up puts in at least 10% of project cost and must show projected coverage of 1.15x within two years [31]. A tunnel sized to the minimum equity also borrows more than the $5 million 7(a) limit [31], and in a corridor with several rivals its Year 2 income does not carry the payments. The engine raises equity until Year 2 coverage reaches the floor.
How many express tunnels already operate in Port Charlotte?
At least five membership washes are listed on their operators' own websites: Tommy's Express, two ModWash sites and two Coastal Express sites [12][13][14][17]. Bubble Down has a US 41 site announced, with a page that says 2027 in the body and 2026 in the title [18]. A Mister Car Wash on McCall Road sits in the outer ring [20], and an older El Jobean Road tunnel could not be confirmed.
What do Port Charlotte tunnels charge for unlimited plans?
Tommy's Express, Coastal Express and Bubble Down each post a tiered ladder of unlimited plans with dollar amounts on their own pages [12][16][18]. ModWash names its plan tiers on both location pages and posts no dollar amounts [13][14]. This page does not print the amounts, because none of the operator pages carries a publication date, and the model's blended plan price is a labelled assumption. Pulling fresh menus is a lender condition.
Is the site in a flood zone?
Unknown for a hypothetical pad, and that is a lender condition. The nearest operating tunnel, on Murdock Circle, sits on a lot split between Zone AE and Zone X on a FEMA panel effective December 15, 2022 [11]. A pad in Zone AE needs the tunnel equipment set above base flood elevation or floodproofed, and the lender will require flood insurance on the building.
Is population growth enough to justify another tunnel?
It supports the format, not the loan. Charlotte County grew 16.3% from April 2020 to July 2025 [1], and the county's own report counted 5.5% growth in the ten months to February 2025 [4]. But growth is concentrated in West Port and Babcock Ranch, which took 82% of residential construction since 2024 [4], and rival tunnels are already selling plans on US 41. The model therefore underwrites a modest member base.
Will the 7(a) lender order a feasibility study for this tunnel?
The rule says that 13 CFR 120.160(b): SBA may require professional appraisals, a survey, or a feasibility study [34]. It is not automatic. For a start-up car wash on special purpose property, a lender may ask for one anyway, and a study that builds the competitor census and the coverage test answers the question before it is asked.
Planning a tunnel on a Florida corridor that already has members? Test the site against the debt before you sign.
Feasibility Study Company builds the trade area, the competitor census and the coverage test from dated public records for owners, developers and their lenders.
Request a methodology briefingData sources and dates
Each market figure on this page names its publisher, title, date and link below. Model inputs that no source gives are marked as assumptions, with their reasoning, in the inputs table.
- U.S. Census Bureau, QuickFacts: Charlotte County, Florida, Vintage 2025 (July 1, 2025; April 2020 estimates base), ACS 2020 to 2024, 2023 County Business Patterns and 2025 building permits.
- U.S. Census Bureau, QuickFacts: Port Charlotte CDP, Florida, 2020 Census and ACS 2020 to 2024.
- U.S. Census Bureau, QuickFacts: Port Charlotte CDP and the United States, ACS 2020 to 2024.
- Charlotte County, Monthly Report, April 2025, April 2025 (population as of February 2025).
- Sun Newspapers (citing the Florida Sports Foundation), Rays, Braves, Orioles brought out nearly a quarter-million people, Spring training season of February 21 to March 24, 2026.
- Charlotte County, Resolution Package, Final Public Hearing (FY2025-26 millage and budget), September 23, 2025.
- Charlotte County, Tentative Millage Rates and Budget, September 4, 2025.
- Charlotte County, Property Tax Reform (Board of County Commissioners presentation), January 20, 2026 (millage series through September 2025).
- Charlotte County, Impact Fee Study, August 2020.
- Charlotte County, FY25 Proposed Budget, tentative budget workshop, July 17, 2024.
- Charlotte County Property Appraiser, Parcel record for the Tommy's Express lot on Murdock Circle, Record updated October 14, 2026 (2026 roll).
- Tommy's Express, Tommy's Express in Port Charlotte, FL, Operator location page; page modified April 23, 2026.
- ModWash, Port Charlotte (Veterans Blvd), Operator location page; page modified April 21, 2026.
- ModWash, Port Charlotte (Beatrix Blvd), Operator location page; confirmed October 29, 2026.
- Professional Carwashing & Detailing (carwash.com), ModWash opens Port Charlotte carwash, Article undated (grand opening on a Friday, July 10; no year stated).
- Coastal Express Car Wash, Port Charlotte Wash Packages, Operator page; last modified July 22, 2025.
- Coastal Express Car Wash, Locations, Operator page; confirmed October 29, 2026.
- Bubble Down, Port Charlotte Car Wash (Coming 2026), Operator page; updated October 5, 2026.
- Circle K, Gas station and store locator entry, Veterans Blvd, Port Charlotte, Operator store locator.
- Sun Newspapers, There's gold in suds: $6 million for a Port Charlotte car wash, October 14, 2026.
- Mister Car Wash, Form 10-K for fiscal year 2025, Filed February 27, 2026.
- Mister Car Wash (GlobeNewswire), Mister Car Wash Announces Fourth Quarter and Full Year 2025 Results, February 18, 2026.
- Mister Car Wash, Mister Car Wash Announces Third Quarter 2025 Results, October 29, 2025.
- Franchise Chatter, Tommy's Express Car Wash Franchise Review 2026 (Item 19 transcription), April 15, 2026 (calendar 2024 results, 2025 disclosure document).
- Franzy, Tommy's Express Franchise Analysis (2026 disclosure document), 2026 disclosure document.
- Raymond James Investment Banking, Car Wash Insight, Spring 2026 (citing B+E listed inventory), Spring 2026 (April 2026 data).
- B+E, Mighty Wash (tenant page: listed net-lease express wash sites), As of May 5, 2026.
- Associated General Contractors of America, Construction Input Costs Climb 8.9% Between August 2025 And August 2026, September 10, 2026.
- B+E, August 2025 Net Lease Car Wash Properties Report, August 2025.
- U.S. Small Business Administration, 7(a) loan program: terms, conditions and eligibility, September 16, 2026.
- U.S. Small Business Administration, SOP 50 10 8.1, Lender and Development Company Loan Programs, with Technical Policy Updates, Effective October 1, 2026.
- U.S. Small Business Administration, Information Notice 5000-881797: FY 2027 7(a) Program Fees, 2026.
- Board of Governors of the Federal Reserve System, H.15 Selected Interest Rates, Release of October 9, 2026.
- eCFR, 13 CFR 120.160, Loan conditions, Current to October 7, 2026.
- NAGGL, Procedural Notice Revising SOP 50 10 8 for New Citizenship and Residency Requirements (Notice 5000-876626), February 12, 2026 (effective March 1, 2026).