Regulatory Library · USDA

7 CFR Part 5001: OneRD Guaranteed Loans

7 CFR part 5001 is the USDA OneRD rule for guaranteed Business and Industry (B&I) and Rural Energy for America Program (REAP) loans, Community Facilities (CF) loans and Water and Waste Disposal loans, and it is the text that defines a feasibility study and says when one is required. Feasibility Study Company prepares the independent studies this rule describes. This page quotes each operative section, with its number, so a borrower or lender can read the rule itself 1.

What the Part Is

One rule governs four guaranteed loan programs.

Part 5001 replaced separate program rules with a single set of definitions, application contents and limits.

The part covers guaranteed loans for B&I, CF, REAP and Water and Waste Disposal projects, which is why it is called the OneRD guaranteed loan rule 1. Its feasibility provisions are spread across definitions (5001.3), eligible uses (5001.121), the lender's file (5001.202 and 5001.203) and one application section for each program (5001.303 to 5001.307). The sections below take them in that order.

The text last changed on . That change was a correction to the affiliate definition and an equity sentence, and it did not touch feasibility study wording 2. The part dates from 85 FR 42518 (July 14, 2020), and the sections that set the feasibility triggers and limits were last amended on September 30, 2024, in the eCFR from November 29, 2024 1. For the five components a study must prove, read our note on the five USDA components applied; for who must prepare it and when, see the USDA feasibility study requirements page.

The Definition

Section 5001.3 says what a feasibility study is.

The definition fixes the preparer, the five subjects and the standard the report is measured against.

Section 5001.3 defines a feasibility study as “a report including an opinion or finding conducted by an independent qualified consultant(s) evaluating the economic, market, technical, financial, and management feasibility of the proposed project or operation in terms of its expectation for success as outlined in appendix A to subpart D of this part” 1. That sentence sets three tests: the report gives an opinion or finding, its author is independent and qualified, and it addresses all five subjects.

The same section defines financial feasibility as “the ability of a project to achieve sufficient income, credit, and cash flow to financially sustain the project over the long term and meet all debt obligations” 1. A study that shows revenue but not debt service over the long term does not meet that sentence.

The two appendices to subpart D, A for the components of a feasibility study and B for financial feasibility reports, are published as images in eCFR, so their text does not appear in the searchable part. The rule sends the reader to Appendix A for what a study should include and to Appendix B for the financial report in 5001.304 1.

When a Study Is Required

The rule requires a study in some cases and lets the Agency ask for one in others.

Each program section sets its own trigger. Three are mandatory: two turn on a new borrower and a loan size, and one on a startup cooperative.

Section 5001.303(c)(4) is the general rule for the application file: “If the Agency is unable to determine a basis for successful repayment of a guaranteed loan based on the documentation and analysis of the five feasibility study components provided in the lender's analysis, borrower's business plan, or other project information, or if the proposed project will have significant impacts on existing operations, the Agency may require an independent feasibility study” 1. It adds that the study “should be prepared by a qualified, independent third party” 1.

SectionApplies toWhat the text saysStudy status
5001.306(a)(3)(i)B&I loansOver $1,000,000 to a new business: a study from an independent qualified consultant that the Agency acceptsRequired
5001.306(a)(3)(ii)B&I loansLoans at or under $1,000,000, where the lender's file falls short or the project would reshape an existing borrower's operationsMay be required
5001.304(a)(4)(i)CF loansOver $1,000,000 to a new entity or one conducting a new activity: a study from an independent qualified consultant that the Agency acceptsRequired
5001.304(a)(4)CF loansWhen economic viability, technical feasibility or market feasibility remains unproven in the lender's fileMay be required
5001.307(d)REAP renewable energy systems“when deemed necessary by the lender or Agency,” a study conforming to 5001.3 and Appendix AWhen deemed necessary
5001.140(a)(7)Cooperative stock salesA study of the cooperative for startup cooperatives, and for existing ones when operations will be significantly affected by stock sale proceedsRequired for startups; may be required for others

For B&I, section 5001.306 sets two application paths, split at a guaranteed amount of $600,000: the fuller information in paragraph (a) above it, and a streamlined file in paragraph (b) at or below it, which the Agency accepts only if the file is “sufficient to determine the technical feasibility, market feasibility, and economic viability of the project” 1. A technical report is also required under 5001.306(a)(3)(iii) for renewable energy systems and projects with integrated processing equipment, and it may sit inside the study 1.

For CF loans, section 5001.304 sorts files into two documents. The lender may itself write a financial feasibility analysis in three situations: loans up to $25 million to existing facilities, loans backed by general obligation bonds or other tax support, and borrowers whose audited statements show they can pay all debt service. Outside those, paragraph (b) requires the examination-opinion report, “prepared in accordance with the standards of attestation of the American Institute of Certified Public Accountants,” with professional liability insurance in place 1.

The Lender's File

The lender writes its own evaluation of the study.

The study does not go in alone. The rule asks the lender to evaluate it and to appraise the collateral.

Section 5001.202(b)(6)(ii) lists, among the items a lender submits, “A written evaluation of the feasibility study, business plan, technical report, and engineering and architectural reports, as applicable” 1. A study therefore has to be written so that a credit officer can summarize its findings and say whether the lender agrees. A study that the lender cannot evaluate in writing is a study the Agency will question.

Section 5001.203 covers appraisals. Real estate appraisals are required above a dollar threshold that the section ties to the FIRREA limit, and each “must be conducted by an independent qualified appraiser in accordance with the USPAP or similar Agency approved standard” (5001.203(c) and (d)(1)) 1. The study's market value assumptions and the appraisal are separate documents, and the lender reconciles them.

The cost of the work is an eligible use. Section 5001.121 lists “Feasibility studies and business plans” among B&I uses in paragraph (c)(10), and in paragraph (d)(11) allows REAP guaranteed loan funds to pay for studies and reports “completed and acceptable to the Agency,” so long as no part of the cost came from another federal or state grant 1.

Limits and Guarantee

Loan limits and guarantee percentages sit in 5001.406 and 5001.407.

Limits are in the rule. The guarantee percentage for each program is set yearly by notice.

ItemFigureSection or notice
Maximum B&I guaranteed loans to one borrower$25 million5001.406(c) 1
B&I cooperative limit, Secretary's discretionUp to $40 million5001.406(c) 1
Maximum CF guaranteed loans to one borrower$100 million5001.406(a) 1
Maximum REAP guaranteed loans to one borrower$25 million, up to 75% of eligible project costs5001.406(d) 1
Maximum guarantee90% of eligible loss5001.407 1
FY2026 B&I guarantee, smaller loans (first tier of the notice)85%91 FR 11272 3
FY2026 B&I guarantee, larger loans (second tier of the notice)80%91 FR 11272 3
FY2026 CF and REAP guarantee80%91 FR 11272 3

Section 5001.407 states that the “maximum guarantee is 90 percent of eligible guaranteed loan loss” and that the Agency “will announce annual guarantee percentages each fiscal year by publishing a document in the Federal Register” 1. The latest notice on file is the fiscal year 2026 notice, effective October 1, 2025, and it applies to loans obligated in fiscal year 2026 unless a later appropriation changes it 3. This page carries no fiscal year 2027 percentage because none was found on the date below.

Currency

Dates, amendments and last check.

When the part was published, when it was amended and when the stored text was last checked.

ItemDate
eCFR up to date as of
Part 5001, last amendedDecember 11, 2025 (correction, 90 FR 57351) 2
Part first publishedJuly 14, 2020 (85 FR 42518), in the eCFR from October 1, 2020 1
Feasibility trigger and limit sections (5001.303 to 5001.307, 5001.406), last amendedSeptember 30, 2024, in the eCFR from November 29, 2024 1
Last checked by Feasibility Study CompanyNovember 8, 2026
Part 5001 Questions

Questions about the OneRD rule.

Which sections of part 5001 mention a feasibility study?

The definition in 5001.3, the lender's file in 5001.202, the eligible uses in 5001.121, the program application sections 5001.303, 5001.304, 5001.306 and 5001.307, and 5001.140(a)(7) for cooperative stock loans 1. The USDA feasibility study requirements page applies them to a loan.

What does the study have to cover?

Under 5001.3, a study covers five fields: economic, market, technical, financial and management 1. The content outline sits in Appendix A to subpart D, which eCFR publishes as an image, so we work from the appendix itself and not from the text of the section.

What does the lender write about the study?

Under 5001.202(b)(6)(ii) the lender submits, with the study, a written evaluation of it and of the business plan, technical report and engineering and architectural reports, as applicable 1.

What loan limit and guarantee does part 5001 state?

For B&I, up to $25 million to one borrower and a maximum guarantee of 90% (5001.406(c), 5001.407); the percentage for each year comes from a Federal Register notice 13.

Did the December 2025 correction change any of this?

No. The correction published December 11, 2025 amended 5001.3, 5001.105 and 5001.106 for the affiliate definition and restored a sentence removed in error, and the Federal Register text carries no feasibility or market study wording 2.

Reading 5001 for your own loan? Start with the study the rule describes.

Feasibility Study Company's studies follow the five components in 5001.3 and are written to be evaluated by the lender under 5001.202. Tell us the guarantee you are pursuing and we will show how the study maps to it.

Request a methodology briefing
Primary Texts

Primary texts and dates.

Primary texts come first. The eCFR described itself as current on November 5, 2026, and each quotation here was matched to the stored text on November 8, 2026.

  1. eCFR (Office of the Federal Register), 7 CFR Part 5001, Guaranteed Loans (OneRD), up to date as of November 5, 2026; last amended December 11, 2025.
  2. Federal Register (USDA), OneRD Guaranteed Loan Regulation, correction (90 FR 57351, FR Doc 2025-22567), December 11, 2025.
  3. Federal Register (USDA), OneRD Annual Notice of Guarantee Fee Rates and Loan Guarantee Percentage, Fiscal Year 2026 (91 FR 11272, FR Doc 2026-04581), March 9, 2026, effective October 1, 2025.
Inquiries

Request a feasibility study.

Describe the project, the capital source and the timeline, and Feasibility Study Company will reply by email.