Regulatory Library

SBA and USDA Feasibility Study Regulations

Every SBA and USDA feasibility study answers to a primary text, and this library holds those texts in one place. Feasibility Study Company prepares the studies. Each library page quotes a regulation's operative words with the section number, gives the effective date, summarizes what changed and states when the stored text was last read against its source.

What This Is

One page per primary text the site relies on.

The library exists so that a borrower, a lender or a reader of our studies can check a rule against its source without searching for it.

A feasibility study is written to a rule. The rule may be a federal regulation, a lender rulebook or a notice, and it decides who must prepare the study, when a lender or an agency may ask for it and what it has to cover. Most of what is said about those rules online is paraphrase. This library goes to the text.

Each library page covers one primary text. It quotes the operative words with the section number, so the reader sees what the agency wrote and not what someone remembers it saying. It gives the effective date of the text, and the date the text was last amended. It says what changed, in a few sentences, and sends longer questions to the research note that owns them. And it shows a visible checked date, the day the stored text was read against the publisher's current version; where that comparison was not possible, the page says what was compared instead.

Where a text is silent, the page says so. Several texts that are often described as requiring a feasibility study say only that an agency may ask for one, and the pages keep that difference, because it changes what a borrower should plan for. The hub pages for SBA 7(a) and 504 loans and USDA Rural Development apply these texts to a project.

How To Read A Page

Read the quote first, then the date, then the note.

Every library page follows the same order, so the answer to a question sits in the same place each time.

The quotation comes first, because it is the rule. It is cut from a stored copy of the text and carries its citation: the document, the section and, for a rulebook, the chapter and paragraph heading. Quotation marks mean the words are the agency's own. Anything outside quotation marks is our reading, and it stays close to the words. Where a rulebook is long, we quote the paragraph a study depends on and name the chapter and heading above it, so the reader can open the document and find the same place in a minute.

The effective date tells the reader which version the quote comes from. For a regulation we give the date the part was last amended and the date the electronic Code of Federal Regulations reported itself current. For a rulebook we give the date it applies from and the notices that issued it.

The what changed paragraph is short on purpose. When a change deserves analysis, the page links the research note that carries it, so the library page stays a reference and the note stays an argument. The SBA feasibility myth note, for example, takes up whether SBA requires a study. Last, the checked date is a statement of work done: on that day we compared the page with the source, and anything newer than that day is not reflected.

By Agency

SBA and USDA write their rules in different places.

The two agencies approach a feasibility study differently, and the library pages follow the difference.

SBA. The agency's authority sits in 13 CFR part 120, where section 120.160(b) is the provision that lets SBA ask for a feasibility study, and the 504 and 7(a) borrower contribution and loan limits sit in the same part. How lenders and certified development companies apply those words is set out in SOP 50 10 8.1.

Eligibility, meaning whether the borrower is small, comes from 13 CFR part 121, which does not describe a study at all.

USDA. Rural Development writes the feasibility study into program regulations. The guaranteed loan regulation, 7 CFR part 5001, makes a study mandatory in three cases, lets the Agency require one in others, and defines the study's components. The rural energy grant rules were rewritten effective October 16, 2026 and now let a renewable energy applicant submit a feasibility study or a resource assessment. The value-added producer grant rules, the Community Facilities rules and the Section 538 rental housing rules each handle the study in their own words. The library gives each its own page.

Keeping It Current

How the pages stay accurate.

A library is only as good as its last check, so the checks are part of the page.

The quotations are cut from stored copies of the texts, then checked as exact matches against the stored file. A figure that changes, such as the SOP's effective date, is written in one place and carried to every page that uses it, so a changed figure cannot sit correct on one page and wrong on another. A reader who finds a difference between a library page and its source should trust the source and tell us, because the checked date on the page is the date to hold us to.

When a source cannot be fetched, the page says that, with the reason. The SOP page is the example: it names the stored copy of SBA's file that was compared and the day it was stored, notes that SBA's document page listed that edition as current on November 8, 2026, and does not claim a fresh comparison of the file.

Last checked: November 8, 2026.

Library Questions

Regulatory library questions.

Which page covers the SBA feasibility study question?

The research note on the SBA feasibility myth owns that question and reads 13 CFR 120.160(b) in full. The 13 CFR part 120 page in this library carries the section's text 1, and the SOP 50 10 8.1 page covers the lender rulebook 2.

Which text governs SBA lender practice on feasibility studies?

Two texts work together. The regulation, 13 CFR 120.160(b), sets the authority 1. The lender rulebook, SOP 50 10 8.1, describes when SBA asks for a study in the 504 credit memorandum 2.

How current are the library pages?

Each page carries its own checked date. The federal regulations were read against the eCFR, which called itself current through November 5, 2026 1, and the library as a whole was last checked on November 8, 2026.

How current is the SOP page?

The comparison used the SOP file that was in force when it was stored on October 10, 2026. SBA's document page listed that edition as current on November 8, 2026 2. The SOP page does not claim a fresh comparison of the file on that date, and it says so plainly.

Does the library cover USDA programs?

Yes. The USDA pages cover the guaranteed loan regulation and the grant programs that name a feasibility study. The list below is generated from the pages that exist, so it is always current.

Underwriting to a rule? Start with the study that answers it.

Feasibility Study Company reads the governing text before it scopes a study. Ask for a methodology briefing and we will show which provision your lender is likely to apply.

Request a methodology briefing
Primary Texts

Primary texts and dates.

The library's own texts are listed on each page. These are the primary texts this door page relies on, each with its publisher and date.

  1. U.S. Government Publishing Office and Office of the Federal Register (eCFR), 13 CFR part 120, Business Loans, eCFR up to date as of November 5, 2026; part last amended June 3, 2025.
  2. U.S. Small Business Administration, SOP 50 10 8.1 with Technical Updates, Lender and Development Company Loan Programs (document page), effective October 1, 2026 for applications received on or after that date; page last updated October 7, 2026.
Inquiries

Request a feasibility study.

Describe the project, the capital source and the timeline, and Feasibility Study Company will reply by email.