Feasibility Study Company works as an independent USDA B&I feasibility study consultant on the study behind a Business and Industry (B&I) guarantee request, and the question that study answers is whether this business, in this place and on this budget, can carry the guaranteed debt. 7 CFR 5001.306(a)(3)(i) makes the study mandatory for a loan over $1,000,000 to a new business 1. The same section lets the Agency ask for one below that line, and the rest of this page sets out the application paths, the equity a new business must bring, the loan limit and the guarantee percentages.

The Study Rule

Section 5001.306 sets the threshold and the two application paths.

A B&I lender submits more when the guaranteed amount is larger, and a study is mandatory at one size and one kind of borrower.

Section 5001.306 sorts B&I applications by the amount of the guaranteed loan: a lender submits the full list of information if the amount is more than $600,000, and the shorter list if it is that amount or less 1. The shorter path is open only "provided the Agency determines that the lender's analysis, borrower's business plan, or other project or borrower information submitted by the lender is sufficient to determine the technical feasibility, market feasibility, and economic viability of the project" 1.

The study itself sits in paragraph (a)(3). The Agency "may require a feasibility study when the lender's analysis, borrower's business plan, or project information is not sufficient to determine the technical feasibility, market feasibility, or economic viability of the project", and paragraph (a)(3)(i) makes it mandatory: "For guaranteed loans greater than $1,000,000.00 to a new business, a feasibility study prepared by an independent qualified consultant acceptable to the Agency is required" 1. Its scope "will be determined by the Agency and is dependent on the complexity of the project and the borrower" 1.

For loans at or below the line, (a)(3)(ii) lets the Agency request a study where the lender's analysis cannot settle technical feasibility or economic viability, "or if the project will significantly affect the operations of a borrower who is an existing business and its historic cash flow" 1. A technical report is a separate requirement, for renewable energy systems and for projects using other integrated processing equipment and systems, and it may sit inside the technical section of a study or stand alone 1.

B&I situationStudySection
Guaranteed loan over $1,000,000, new businessRequired, independent qualified consultant acceptable to the Agency5001.306(a)(3)(i) 1
Loan at or below that amount, new or existing businessThe Agency may require one5001.306(a)(3)(ii) 1
Guaranteed amount over $600,000Full application information under paragraph (a)5001.306 1
Guaranteed amount of $600,000 or lessShorter paragraph (b) path if the Agency finds the file sufficient5001.306(b) 1

A broader rule covers every OneRD guaranteed loan: 5001.303(c)(4) lets the Agency call for an independent study if the file leaves it unable to find a basis for repayment 7. The requirements page covers who may prepare a study and what the lender writes in response. The five components the study has to carry are published as an image in Appendix A to subpart D 8, and the five USDA components note shows how they are applied to a project.

Equity

A new business brings more or less equity depending on how it starts.

Section 5001.105(d) sets the capital a B&I borrower must have at the lender's closing.

The rule requires "sufficient capital or equity to mitigate the ongoing financial and operational risks of the business", in cash or earning assets reflected on the borrower's balance sheet, and equity cannot include appraisal surplus or bargain purchase gains 2. The minimums depend on the borrower's age and the project, and the section gives each an alternative measured by debt-to-equity ratio or by the borrower's investment in the project 2. Because the lender certifies the tier at closing, the financial section of the study should show that the borrower can meet whichever tier applies.

BorrowerMinimum balance sheet equitySection
Existing business10%5001.105(d)(1)(i) 2
New business with sales contracts that meet debt service and match the loan term10%5001.105(d)(2)(i) 2
New business, construction, guarantee requested before completion25%5001.105(d)(3)(i) 2
All other new businesses20%5001.105(d)(4)(i) 2

The Agency may raise the requirement for a loan it judges riskier and may lower it for an existing business under conditions the section lists 2. A new business with a ground-up facility is the case most likely to face the higher tiers, and a study that models the sources and uses under the 25% tier and the 20% tier shows the lender how the loan sizes change.

Limits and Guarantee

The loan limit is in the rule; the guarantee percentage is in the notice.

One is fixed by regulation, the other is set by a Federal Register notice each fiscal year.

Section 5001.406(c) caps B&I guaranteed loans, including guaranteed and unguaranteed portions and existing balances, at $25 million per borrower. The Secretary may approve more, up to $40 million, for rural cooperatives that process value-added agricultural commodities 4.

The guarantee percentage is set differently. The regulation states a maximum of 90% and says the Agency announces annual percentages in the Federal Register 6. The newest notice covers fiscal year 2026 and took effect on October 1, 2025; it governs guaranteed loans obligated in FY2026. It lists 85% for the smaller B&I row and 80% for the larger row, which runs up to the loan limit 5. Those are the FY2026 notice's figures. A loan obligated after that notice's period should have its percentage confirmed with the lender and the state office, because no FY2027 notice had been found by November 8, 2026.

Paying for the Study

A B&I loan may pay for the feasibility study.

The cost of the study is an eligible use of loan funds.

Section 5001.121(c) lists the expenses B&I guaranteed loan funds may pay, and item (10) is "Feasibility studies and business plans" 3. The same list includes professional service fees the Agency approves as reasonable and customary in the area 3. A borrower can therefore plan the study as a project cost, subject to the lender's and the Agency's agreement on amount and timing. The rule does not say the study may be financed before the lender and the Agency have approved the engagement, and a lender will usually want the preparer engaged early because the study shapes the application.

The independence rule matters here. A study paid from loan proceeds must still come from an independent preparer, and the Agency can refuse one that is tied to the borrower 1.

What the Study Answers

For a B&I loan, the study has to show repayment, not just a market.

The Agency reads the study to decide whether a basis for repayment exists.

The rule treats the study as a gap-filler. It comes into play when what the lender and the borrower have supplied leaves a technical, market or economic question open 1, and the Agency's general test is whether it can "determine a basis for successful repayment" 7. A B&I study is therefore built backward from the loan. It starts from the debt the project will carry and asks what the market, the technology and the management have to deliver for that debt to be paid.

That shapes each field. The market work sizes demand in the trade area the project will draw from and tests it against the competitors already there. The technical work asks whether the facility can be built and operated as designed, which for a processing plant or a travel center means equipment, permits and inspection requirements. The financial work projects revenue and cost, then tests coverage of the guaranteed debt under stress. The management work asks whether the people named can run the business. The economic work asks whether the local economy supports all of it. Financial feasibility has its own definition in 5001.3: income, credit and cash flow "to financially sustain the project over the long term and meet all debt obligations" 9.

A study for a new business has an extra burden. There is no operating history to project from, so every revenue line has to be built from outside evidence, such as observed demand, competitor pricing and comparable operations, and the equity tier in the rule applies to the same project 2. The study states its assumptions where the lender can find them and shows the result if each one is wrong.

Lender and Agency

Who reads the study, and what each reader does with it.

The preparer, the lender and the Agency each play a distinct part in a B&I file.

The preparer writes the study and gives an opinion or finding 8. The lender answers with its own evaluation of that study, the item listed in 5001.202(b)(6)(ii), and files both with the application. The Agency decides whether the file shows a basis for repayment. A study that the lender cannot endorse in its evaluation weakens the application, and a study that the Agency finds insufficient can be returned for more work.

Because the Agency fixes the scope of a required study for the project, early contact helps. A borrower, lender and preparer who agree on the scope before the work begins avoid the case where a finished study is returned for a field it did not cover. The five fields are the same for every B&I project, and the weight each carries changes with the project: a grocery store leans on trade area and competition, a processing plant on throughput, supply and inspection, a travel center on traffic and fuel margin.

For the loan itself, the lender also looks at the points the study cannot settle: collateral, guarantees and the borrower's credit history. A study supports the credit case and does not replace those items.

Planning a Filing

Four questions to answer before commissioning a study.

The answers fix whether the study is required and how much it has to carry.

  1. Is the borrower a new business? If it is, and the guaranteed loan is over $1,000,000, the study is mandatory 1.
  2. Which application path applies? The split at $600,000 decides how much the lender submits 1.
  3. Which equity tier applies, and can the borrower meet it at closing? The tiers run from 10% to 25% 2.
  4. Does the request fit under the $25 million limit once existing B&I debt is counted? The limit includes outstanding balances 4.
Worked Cases

Hypothetical B&I worked examples.

Each case is a hypothetical worked example of one kind of project, set against the B&I rules.

The cases below apply the study rule to specific projects. Each site, sponsor and project is hypothetical, and none was submitted to the Agency or accepted by it. Each reads the market, builds the projection and tests the loan against the program's requirements, which illustrates what a B&I study covers for that asset type.

B&I Questions

USDA B&I feasibility study questions.

When does a B&I loan need a feasibility study?

For a guaranteed loan over $1,000,000 to a new business, paragraph (a)(3)(i) of 5001.306 makes the study mandatory, prepared by a consultant the Agency accepts 1. Below that, the Agency decides case by case whether the file needs one 1.

Can B&I loan funds pay for the study?

Yes, in principle: 5001.121(c)(10) lists "feasibility studies and business plans" among the expenses B&I guaranteed loan funds may pay 3. Confirm with the lender how the cost is scheduled in the sources and uses.

How much equity does a new business need?

10% with sales contracts that meet the rule, 25% for construction when the guarantee is requested before completion, and 20% for other new businesses, each as balance sheet equity at closing, with alternatives the section lists 2.

What is the B&I loan limit?

$25 million per borrower, and up to $40 million for qualifying value-added agricultural cooperatives at the Secretary's discretion 4.

What guarantee percentage applies?

The FY2026 notice sets 85% for the smaller B&I loans and 80% for the larger ones 5. No FY2027 notice had come to light by November 8, 2026, so these are the latest percentages published.

Preparing a B&I application? Start with the study the rule requires.

Send the project, the borrower's status and the proposed loan. Feasibility Study Company will tell you whether 5001.306 makes a study mandatory and what the lender will expect it to carry.

Request a methodology briefing
Sources

Data sources and dates.

Regulatory text is from the current eCFR, and the guarantee percentages come from the fiscal year 2026 Federal Register notice. The worked cases are this site's own hypothetical examples.

  1. eCFR, 7 CFR 5001.306, Business and Industry application requirements, current to November 5, 2026; effective November 29, 2024.
  2. eCFR, 7 CFR 5001.105, Eligible B&I projects and requirements (paragraph (d), equity), current to November 5, 2026; amended December 11, 2025.
  3. eCFR, 7 CFR 5001.121, Eligible uses of guaranteed loan funds (paragraph (c), B&I projects), current to November 5, 2026; effective November 29, 2024.
  4. eCFR, 7 CFR 5001.406, Maximum loan amounts (paragraph (c), B&I projects), current to November 5, 2026; effective November 29, 2024.
  5. Federal Register (Rural Development), OneRD Annual Notice of Guarantee Fee Rates, Annual Renewal Fee Rates and Loan Guarantee Percentages, Fiscal Year 2026 (91 FR 11272, document 2026-04581), March 9, 2026 (effective October 1, 2025; no FY2027 notice found as of November 8, 2026).
  6. eCFR, 7 CFR 5001.407, Guarantee percentage, current to November 5, 2026; effective October 1, 2020.
  7. eCFR, 7 CFR 5001.303, Guaranteed loan application requirements, current to November 5, 2026; effective November 29, 2024.
  8. eCFR, 7 CFR Part 5001, Subpart D (Appendix A, published as an image), current to November 5, 2026.
  9. eCFR, 7 CFR 5001.3, Definitions (financial feasibility, feasibility study), current to November 5, 2026.
Inquiries

Request a feasibility study.